Share Project
Nordstrom Santa Monica was a $2.7 million dollar renovation of an existing May Co. store in the Santa Monica Place mall. 51³Ô¹ÏÍø installed a new 3000 amp service at the loading dock and distributed power to the store appox. 350ft away. The store consisted of 2 floors of retail space, The Blue Stove Café and Ebar. The project opened on time despite a 3 month delay at the start of the project and was an LA/NECA Electrical Excellence Award winner in 2011.